Frequently Asked Questions
What is your Minimum Order Quantity (MOQ)?
We do not enforce strict, arbitrary MOQs. Our production is structured to support your entire product lifecycle. We routinely process 50-piece prototype and validation batches. Once approved, we scale seamlessly to 10,000+ piece production runs using the exact same machinery and tolerance standards.
What are your typical lead times?
Lead times depend on part complexity and your chosen freight method. Typically, First Article (FAI) samples are ready in 7–10 days. Mass production runs average 3–4 weeks. Ocean freight (CIF/DDP) adds transit time, while air freight can deliver in days. We provide an exact, reliable timeline with every line-item quote.
Can you provide material certificates and inspection reports?
Absolutely. Governed by our AS9100 and ISO 9001:2015 systems, we maintain complete material traceability. We provide original Mill Test Reports (MTRs) for raw metals, finishing validation reports (e.g., salt spray tests), and comprehensive dimensional layouts with your First Article Inspection (FAI).
