Frequently Asked Questions
Do you offer Design for Manufacturability (DFM) reviews to reduce our production costs?
Yes. We actively review your drawings to uncover hidden savings before production begins, whether you need prototype communication equipment sheet metal fabrication or full-scale manufacturing. For example, a telecom client recently brought us an over-engineered thermal management enclosure that was too heavy and expensive to produce at scale.
We conducted a rigorous DFM review and substituted their expensive proprietary alloy with precision-formed Aluminum 5052-H32. By redesigning the CNC punch tooling for the louver vents, we reduced the per-unit weight by 14% and maintained the NEMA 4X rating. This single intervention generated $27,000 in annualized production savings for the client.
Can you protect our assembly lines from unpredictable sheet metal lead times?
Absolutely. We utilize Vendor Managed Inventory (VMI) programs to completely eradicate supply bottlenecks and ensure rapid turnaround sheet metal fabrication communications. A national broadband provider recently approached us because they were experiencing severe assembly line stoppages due to an unpredictable 4-to-6-week lead time on custom 19-inch racks.
We transitioned their production to our VMI program and held three months of strategic safety stock in our facility. This strategic move slashed their component lead times from four weeks to just three days and achieved a 0% stock-out rate over the past 18 months while freeing up their warehouse space.
How do you guarantee your sheet metal components will not slice our delicate fiber-optic cables?
We eliminate this liability completely through our 100% burr-free vibratory finishing process. A network infrastructure manufacturer was suffering an 8% rejection rate because sharp edges on their standard sheet metal junction boxes were slicing delicate fiber-optic jackets during field installation.
We took over the project, implemented our vibratory finishing process, and integrated strict edge-radii checks into our CMM inspection phase. Splicing defects instantly dropped to 0%. This completely eliminated their field failure liabilities and saved the client an estimated $15,000 in scrapped assemblies per quarter.
